Citrix DaaS migration
Move your Citrix sites to DaaS. Keep what works.
We move on-premises Citrix Virtual Apps and Desktops sites to Citrix DaaS, or build new DaaS sites, 20 to 50 times a year. Our engineers did some of the first DaaS migrations at Citrix.
What moves to DaaS and what stays
Citrix runs the control plane: the Delivery Controllers, the site database, Studio and licensing. Your VDAs, images and file shares stay in your datacenters or your cloud. Each location connects to DaaS through a pair of Cloud Connectors, which Citrix calls a resource location.
Most clients also move to newer Windows versions during the project. So we usually build new infrastructure VMs and VDA images, then move users on a swing shift. When an environment has to stay as it is, we upgrade in place instead. Your requirements decide which.
- Quick Start in about 4 weeks
- 20 to 50 DaaS projects a year
- Clean build, swing-shift cutover
- Vendor funding may be available
What's included
Resource locations
Cloud Connector pairs in each datacenter, Azure region or AWS account you run VDAs in.
Images
New Windows Server and Windows 11 VDA images on MCS or Citrix Provisioning, or upgrades of the ones you have.
Policies and apps
Moved with the Citrix Cloud Migration tool, then cleaned up rather than copied as is.
Profiles
FSLogix, or Citrix Profile Management with file-based profiles, profile containers or both together.
Access
Citrix Workspace with your identity provider, such as Okta or Entra ID. Or StoreFront and NetScaler on-premises, with GSLB across sites.
Licensing
The License Activation Service, which replaced license files on April 15, 2026.
Quick Start
A defined starting scope for a new DaaS site or a migration. It covers up to two resource locations and two use cases, and most of the timeline goes into images and testing.
| Scope | Typical time |
|---|---|
| Quick Start: Citrix CVAD or DaaS, up to two resource locations and use cases | About 4 weeks |
| Add NetScaler HA pairs, multiple datacenters or GSLB | 1 to 2 more weeks |
| Each additional image or use case | Scoped in discovery |
Ask about vendor-funded migrations
Several vendors fund migration consulting for qualifying projects, some as promotional offers. We check what yours qualifies for and arrange the funding, working through a partner when the vendor requires one.
How a DaaS migration runs
Assess
Sites, users, apps, images and access. Each user population and its apps becomes a use case.
Design
Resource locations, images, profiles and access, plus a cutover plan with rollback steps.
Build and pilot
Build DaaS in parallel with the current site and pilot it with real users from each use case.
Cut over and hand off
Move users in groups on a swing shift, then hand over as-built documentation and admin training.
DaaS migrations we have delivered
Medical device maker · up to 1,000 users
Four Citrix sites in three countries consolidated into one DaaS site. Three months, 81 engineering hours.
Read the case study →Regional children's hospital · 2,200 users
Epic on Citrix moved from a 2402 LTSR site to DaaS, with NetScaler SDX and GSLB. 15-second logons.
Read the case study →Electric utility · 2,000 users, scaling to 100,000
Horizon users moved to Citrix DaaS on vSphere and AWS WorkSpaces Core. 218 project hours.
Read the case study →
Why Interfusion
In DaaS since the start
We performed at least one of the first 25 Citrix DaaS implementations as Citrix Consulting Services consultants.
Rebuild when it pays, upgrade when it must
A clean build clears out years of drift. When that is not an option, we upgrade in place and say what it leaves behind.
Senior engineers only
The engineer who designs the migration also builds and cuts it over.
Questions we hear
How long does a migration to Citrix DaaS take?
About four weeks for a Quick Start covering up to two resource locations and use cases. NetScaler HA pairs, multiple datacenters or GSLB add one to two weeks. Larger projects scale with the number of images and use cases.
Can we move to DaaS without downtime?
Usually, yes. We build the new environment in parallel and move users in groups during a scheduled swing shift. The old site stays up until each group is confirmed on DaaS.
What is a use case?
A group of users, the apps they need and the image built for them. Clinical staff and back office are two use cases, for example.
Do we have to rebuild our images?
Not always. Most clients want newer Windows versions, so we build new images. If yours are current and clean, we upgrade them instead.
Is vendor funding available?
Often. Several vendors fund migration consulting, some as promotional offers. We check what your project qualifies for before you sign anything.
Get a migration estimate
Tell us your sites, users and images. A senior engineer will come back with a scope and a timeline.