Citrix to AVD migration
Citrix to AVD in weeks when Azure is ready.
If you already run Citrix in Azure and own Microsoft 365 E3 or E5, Azure Virtual Desktop may cost less. We moved a 1,000-user law firm from Citrix DaaS to AVD in two weeks.
When AVD makes sense
AVD access rights come with Microsoft 365 E3 and E5, so part of what you pay Citrix for may already be covered. You still pay for Azure compute and storage, and that bill grows if no one right-sizes hosts or sets up autoscale.
AVD fits best when your users and apps already live in Azure and run well on Windows multi-session. When graphics-heavy or EHR apps depend on Citrix HDX, we will tell you so before you move.
- 1,000 users moved in 2 weeks
- Existing images reused where they fit
- Microsoft 365 E3 and E5 access rights
- Vendor funding may be available
What's included
Azure readiness
Networking, firewalls and identity checked or built. This is the difference between two weeks and longer.
Images
Existing Citrix VDA images copied into AVD when they fit, rebuilt when they do not.
Host pools and scaling
Pooled or personal host pools, with autoscale to keep the Azure bill in line with use.
Profiles
FSLogix profile and Office containers, carried over from Citrix where they already exist.
Access
Entra ID sign-in with Conditional Access and MFA, replacing the Citrix access layer.
Cost comparison
Citrix licensing against Azure compute and storage for the same users, before you commit.
How long it takes
Most of the time goes into Azure groundwork and images. When both are ready, the move itself is fast.
| Starting point | Typical time |
|---|---|
| Citrix already in Azure, with networking, identity and reusable images in place | About 2 weeks for 1,000 users |
| New Azure environment: virtual networks, firewalls and identity to set up | Longer, scoped in discovery |
| New images or additional use cases | Added per image or use case |
Ask about vendor-funded migrations
Several vendors fund migration consulting for qualifying projects, some as promotional offers. We check what yours qualifies for and arrange the funding, working through a partner when the vendor requires one.
How a Citrix to AVD migration runs
Compare
Citrix cost against AVD for your users, plus which apps need testing on AVD.
Prepare Azure
Networking, identity and storage checked, and built where they are missing.
Build and pilot
Host pools built from your images, then piloted with real users from each group.
Cut over and hand off
Users moved in groups while Citrix stays up, then documentation and admin training.
AVD migrations we have delivered
Law firm · 1,000 users
Citrix DaaS on Azure to AVD in two weeks after a DaaS price increase, reusing the existing VDA images.
Read the case study →Growing organization · remote workforce
On-premises VDI replaced with AVD, FSLogix and Intune. Live in 8 weeks, infrastructure costs down 40%.
Read the case study →
Why Interfusion
We know both sides
We have worked on Citrix since 2002, long before AVD existed. We know what changes for users when you switch.
Straight about AVD limits
If your apps need Citrix HDX or EHR vendor support, we say so before you spend money on a move.
Senior engineers only
The engineer who runs the cost comparison also builds the host pools and moves your users.
Questions we hear
How long does a Citrix to AVD migration take?
It depends on what already exists in Azure. We moved 1,000 users from Citrix DaaS on Azure to AVD in two weeks. Networking, security and identity were already in place, so we copied the existing VDA images into AVD. A new AVD build that also needs Azure networking, firewalls and identity set up takes longer.
Is AVD cheaper than Citrix?
Often, if you own Microsoft 365 E3 or E5 and keep hosts right-sized. Azure compute bills monthly, so autoscale matters. We build the comparison with your numbers before you decide.
Can we keep our Citrix images?
Often, when Citrix already runs in Azure. We copy the images into AVD and remove the Citrix components. Older or on-premises images usually get rebuilt.
Can I migrate off Citrix without downtime?
Usually, yes. We build the new environment in parallel and move users in groups during a scheduled swing shift. The old platform stays up until each group is confirmed on the new one.
Is vendor funding available?
Often. Several vendors fund migration consulting, some as promotional offers. We check what your project qualifies for before you sign anything.
Get a migration estimate
Tell us your users, images and what already runs in Azure. A senior engineer will come back with a cost comparison and a timeline.